Allen Wireline Service, Inc.
Offering 24-Hour Service
We perform all Texas Railroad Commission Tests
including H-5, H-15, H-9 (H2S Test) & G-1 Open Flow Potential Test
including H-5, H-15, H-9 (H2S Test) & G-1 Open Flow Potential Test
Also Offering:
- Fluid Levels/Dynamometer Service (Echometer)
- Automatic Well Sounding Buildups
- Bottom Hole Pressure Surveys
- Build-Up and Draw-Down Test
- Pressure Transient Analysis
- Reservoir Analysis
- Temperature Surveys
- Step Rate Test
- Deviation Survey
- Bottom Hole Chokes & Plugs
- Gas Well Potential Test (4-Point or 1-Point)
- Paraffin Cutting
- Plunger Work
- Portable 3-Phase Separators
Previous
Next
"Doing Business Since 1967"